Two years in the planning and we have FINALLY started.

Translate

Wednesday, April 18, 2012

Week 49

Now that I am getting up to speed here, a fair bit has happened. 
My fixtures have been installed.  All just like I wanted.  The kitchen faucet I love and I will be taking that with me when I leave methinks. The wire hanging above it is for the under cabinet lighting. The faucet for the bathroom sink worked out well.  The cabinet and counter from Costco had a single hole pre drilled.  Despite the reservations of the counter top installers, I requested them to drill two additional holes in the marble countertop and I was able to have matching fixtures as the tub.  Still can't use the tub, but I have fixtures.